Information
We hold stocks of steel galvanised screw piles of various sizes which, are matched to the torque installation heads and the design requirements. We Supply to our approved installers via pallet service normally within 5 working days. Currently, we offer two sizes of screw piles. These sizes along with their maximum torque and ultimate load (ULS) are given in the table below.Our Installers use our system and the same equipment.
Information Table
The screw piles are provided in modular sections approximately 2m long. The lead section normally has three galvanised steel helices of increasing size welded to the shaft. If further depth is required, 2m follower sections are provided. Galvanised steel pile caps are also available.
For more information, costs, or to request a quote, please call 01692 538888 or email enquiries@screwpilesltd.co.uk.
Diameter (mm) | Length (m) | Max Torque (kNm) | ULS (kN) |
---|---|---|---|
76.1 | 2 | 7.5 | 225 |
89.1 | 2 | 13.0 | 360 |
Get in touch
For more information, costs, or to request a quote, please call 01692 538888 or email enquiries@screwpilesltd.co.uk.
FAQs
- How do screw piles work?
- How long does it take to install a screw pile?
- What loading can be carried?
- How much site disturbance can I expect?
- Low carbon footprint – Sustainable technology?
- History of Screw Piles
For more information, costs, or to request a quote, please call 01692 538888 or email enquiries@screwpilesltd.co.uk.
Installation speed of 6 to 10 rpm. Depending on the extension section being used, our team can attach a pipe or square-shaft extension in about a minute, a 6M installation should take no more than 30 minutes to install.
For more information, costs, or to request a quote, please call 01692 538888 or email enquiries@screwpilesltd.co.uk.
In most soil conditions, the ultimate capacity of screw piles and helical anchors will increase slightly with time, this is particularly true with cohesive soils. The load capacity is a function of the torque required to install the pile considered together with the design load based on the subsoil values.
Pile loadings between 75Kn and 150Kn working load are achievable with the smaller range of screw piles.
For more information, costs, or to request a quote, please call 01692 538888 or email enquiries@screwpilesltd.co.uk.
Screw pile installation equipment has a small footprint and produces minimal disruption to adjacent structures.
For more information, costings and to requestion a quotation, please call 01692 538888 or email enquiries@screwpilesltd.co.uk.
The pile does not need to be abandoned at end of use like driven pile or drilled shaft or a grouted piles.
For more information, costs, or to request a quote, please call 01692 538888 or email enquiries@screwpilesltd.co.uk.
During the 1970s, Chance anchors developed smaller diameter helical screw piles that could be installed with modern hydraulic equipment. Most screw piles today are based on solid bar or tubular shafts of up to 200mm in diameter, with double or triple helices often galvanised to offer greater protection in aggressive soils.
Screw pile foundations are used extensively across a range of industries, including road, rail and telecommunications. The benefit of using ground screw foundations is that they take less time to install than a standard concrete foundation. Less machinery is required, and this helps to keep costs low. You can also expect a lower carbon footprint, and there will be no need to remove any soil from the site. Screw pile foundations can be laid close to existing structures, and when they are no longer needed, can be removed as easily as they were installed.